Saturday

December 28th , 2024

FOLLOW US
pc

News Avenue

2 years ago

TEMA MOTORWAY; WE'RE WORKING TIRELESSLY TO COMPLETE MAINTENANCE BY FRIDAY ? ROADS MINISTRY

featured img
News

2 years ago



The Assistance of Roads and Streets, alongside Ghana Turnpike Authority, has ensured residents on the Accra-Tema motorway that the on the Lakplakpa framework will be done by Friday

 

The Help saw that the task laborer has begun work on fixing modernized steel on the influenced piece of the platform.

 

It ensures average traffic stream by Friday, June 17, 2022.

 

This was contained in a press clarification on Tuesday, June 14, 2022 supported by Nasir Ahmad Yartey the Head of Promoting Unit, which divulged that the action has become significant resulting to recognizing the mistake of a steel deck that was replaced in 2014 on one scope of the 2-length range, which has as of now influenced the steel support points and welds in the platform to avoid any possible loss of lives.

 

As a component of their activities to moderate traffic troubles making the rounds, the Help in like manner urged drivers and drivers to use elective roads like Fertilizer Road, Tsui Bleoo Road, Spintex Road 1, Teshie Association, Adogon Turnpike, and Burma Camp Roads 1 and 2.

 

The Assistance saw that the specialists for recruit working on the Sea side Road have been composed to open the twofold carriageway part of the road to traffic.

 

The help has apologized for the weight the work has caused road clients on that section of the motorway.

 

Find underneath the full conveyance by the roads and expressways administration

 

Emergency Manages ACCRA-TEMA MOTORWAY

 

1. The Assistance of Roads and Avenues acting through the Ghana Turnpike Authority is endeavored emergency fix works on the Lakplakpa stream range on the Accra-bound fragment of the Accra-Tema Motorway.

 

2. In 2014, one scope of the 2-length range was superseded with a steel deck.

 

3. At this point, the steel deck has failed and forsakes have occurred in the abundance upheld significant segment. The deformations on the steel deck have affected the steel points of support and welds.

 

4. To save life and property, it was essential to close that section of the road for emergency fixes.

 

5. The Ghana Turnpike Authority has been working continually to reproduce the deck, applying current advancement of significant creation and use to ensure that the road is opened to traffic by Friday, seventeenth June 2022 at 6:00 am.

 

6. Despite the consistent traffic the leaders gauges on the motorway highlighted facilitating the tries to the motoring public, Laborers for recruit working on the Sea side road have been composed to ensure that the twofold carriage portions are opened to traffic.

 

7. The motoring public is urged to use elective roads like Fertilizer Road, Tsui Bleoo Road, Spintex Road 1, Teshie Association, Adogon Interstate and Burma Camp Roads 1 and 2 and follow directional signs.

 

8. The Help genuinely apologizes for the irritation caused to the motoring public.

Total Comments: 0

Meet the Author


PC
News Avenue

Content writer

follow me

INTERSTING TOPICS


Connect and interact with amazing Authors in our twitter community